• 05052025
    Construction Process of Pre-buried and Reserved PVC Drainage Pipeline in AD (1)
    Construction Process of Pre-buried and Reserved PVC Drainage Pipeline in AD (1)
    Hubei AD Building Materials provides professional PVC drainage pipe construction guidelines: covering the selection of r...
    View details
  • 31032025
    HDPE double wall corrugated pipe installation and precautions
    HDPE double wall corrugated pipe installation and precautions
    This paper focuses on the construction specification of HDPE double-wall corrugated pipe of Hubei Aoyuan Building Materi...
    View details
  • 26042025
    Several Common Problems and Solutions in the Installation of Municipal Water Sup
    Several Common Problems and Solutions in the Installation of Municipal Water Sup
    Hubei AD Building Materials Co., Ltd., as a professional PE double-wall corrugated pipe manufacturer, has been committed...
    View details
  • 01052025
    Double wall corrugated pipe construction manual
    Double wall corrugated pipe construction manual
    Contact number: 17399989993 double-wall corrugated pipe construction manual provides professional construction guidance,...
    View details
  • 05052025
    Construction method of trenchless pipe drawing, PE towed pipe construction
    Construction method of trenchless pipe drawing, PE towed pipe construction
    Contact number: 17399989993 professional provides trenchless pipe construction, PE tractor pipe construction services, u...
    View details
  • 05052025
    HDPE water supply pipe hot melt docking process~ AD PE pipe
    HDPE water supply pipe hot melt docking process~ AD PE pipe
    Contact number: 17399989993 HDPE water supply pipe hot melt docking process forms high-strength welding through high-tem...
    View details
  • 05052025
    HDPE steel mesh skeleton composite pipe construction animation detailed explanat
    HDPE steel mesh skeleton composite pipe construction animation detailed explanat
    Contact number: 17399989993 super detailed HDPE steel mesh skeleton composite pipe construction animation, through three...
    View details
  • 19032025
    公元pe管拖拉管施工,公元管道湖北pe非开挖管施工流程,施工动画详解
  • 20032025
    PE钢丝网骨架复合管施工工艺流程 公元PE管 公元管道湖北PE管厂家
  • 05052025
    Construction Control of Trenchless Directional Drilling for PE Drainage Pipe
    Construction Control of Trenchless Directional Drilling for PE Drainage Pipe
    Analysis of construction control points for trenchless directional drilling of PE drain pipes! Covers core technologies ...
    View details
  • 31032025
    Welding and Laying of PE Pipe in AD
    Welding and Laying of PE Pipe in AD
    Contact number: 17399989993 AD PE pipeline welding and laying adopts standardized processes such as hot melt docking and...
    View details
  • 05052025
    Construction steps and product specifications of PE plum blossom pipe
    Construction steps and product specifications of PE plum blossom pipe
    The construction steps of PE plum blossom pipe include pipe trench excavation, pipeline laying, interface connection and...
    View details