six in the morning, the street lights of a residential construction site in the suburbs have not been extinguished. Master Li has held one end of the PE coil and slowly unfolded along the base groove mark - the white pipe is like a flexible ribbon, extending tens of meters along the terrain. "In the past, when laying PVC pipes, dozens of 1-meter short pipes had to be moved to connect dozens of joints. Now a roll of AD coil is pulled to the end, saving half the effort." Master Li wiped his sweat, and the workers behind him were using a hot melt machine to treat the end. The heating head contacted the pipe wall for less than 10 seconds to complete the seal. Scenes like
are being staged at more construction sites. The pain points of traditional plastic pipeline construction "short-section splicing trouble, difficult terrain adaptation, and low connection efficiency" were cracked by AD PE coil one by one:
Less joints, reduced risk - conventional AD coil length reaches 50-200 meters, a fire protection pipeline project in an industrial park replaces short pipes with 100-meter coils, 60 joints are reduced to 5, saving 2 hours splicing time, and reducing water leakage hazards by 90%;
can bend, saving excavation - PE material can achieve 10 times the pipe diameter bending, in the renovation of an old community, the coil directly bypasses 3 old trees and sewage wells, without digging the trail, and is completed 2 days in advance;
is easy to connect, and novices will also - hot melt technology docks in 10 seconds and solidifies in 1 minute, a rural drinking water project 4 workers lay 2 kilometers of main pipes in one day, 2 days faster than PVC pipes;
has stable quality and no rework - each coil is tested online, the wall thickness is uniform and pressure-resistant, and the construction in mountainous areas will not be damaged in case of slight settlement, and rework will be avoided from the source;
has full service and solves pain points - technical engineers provide on-site guidance: adjusting the hot melt temperature in winter and optimizing the route in mountainous areas. Due to the adjustment of the laying angle, a municipal project cut 3 pipelines to save 4 hours.
Today, AD PE coils have covered residential, rural, municipal and other scenarios, making construction "smooth" with the advantages of "less, curved, easy, stable and complete": the average construction period is shortened by 30% -50%, and labor costs are reduced by more than 20%. For AD, this is not a gimmick, but a "user-centric" landing - helping customers "get things done" through products and services.
"Our goal is to make every pipe laying easier and more efficient." The AD product manager said. In the future, AD will continue to deepen the efficient products such as PE coils, promote the efficiency of plastic pipe construction and upgrade, and empower the industry with convenience.