Backfill technology of large diameter PE pipe after installation: layered compaction standard and testing method

2026-10-31

After the installation of large-diameter PE pipes is completed, backfilling is a key step to ensure the stability of the pipeline and the quality of the project. There are strict standards for layered compaction during backfilling. Generally speaking, the thickness of each layer of backfill soil needs to be controlled within a reasonable range, such as no more than 30 cm. In terms of compaction, it should be determined according to different engineering requirements and soil conditions. It is common to achieve a compaction standard of more than 90%.

The detection method cannot be ignored either. The ring knife method can be used to calculate the degree of compaction by cutting the soil sample in the backfill soil layer and measuring its density and other parameters. The sand filling method is also a common method, using the principle of volume replacement of sand to determine the compaction of the fill. In addition, the nuclear density meter detection method can quickly and conveniently obtain the compaction degree data. During the detection process, random inspections should be carried out according to the standard frequency, such as at least one sampling inspection every 100 square meters. Only by strictly controlling the stratification compaction degree standard and accurately applying the detection method can the large-diameter PE pipe perform well after backfilling and ensure the long-term stable operation of the entire project.

Backfill technology of large diameter PE pipe after installation: layered compaction standard and testing methodthe1page