In the buried construction of pe carat pipes, backfilling is very important, and layered backfilling is the key point. The first requirement of layered backfilling is that the backfill thickness of each layer needs to be strictly controlled, generally no more than 30 cm, so as to ensure uniform compaction effect. Backfilling materials are also particular, and soil with uniform texture and no large debris should be selected. In terms of method, backfilling should be carried out symmetrically from both sides of the pipeline to avoid uneven pressure on the pipeline. During the backfilling process, each layer should be compacted, and small compaction machinery or manual compaction can be used. Only by strictly following these layered backfilling requirements and methods can we ensure the stability and safety of pe carat pipes underground, provide reliable protection for subsequent use, prolong the service life of the pipeline, and improve the quality of the entire project.