After the installation of the pe carat pipe is completed, the closed water test is an important quality inspection link. The test method is as follows: First, plug the two ends of the pipe, fill the water to the specified water level, and soak for a certain period of time to make the pipe fully absorb water. Then, observe the water level drop. In terms of qualification standards, the water seepage should meet the requirements of relevant specifications. Generally speaking, within the specified time, the water level does not drop more than the allowable value, and the pipeline has no leakage phenomenon, which is qualified. Through strict closed water test, the sealing and quality of the pe carat pipe installation can be effectively tested, providing protection for subsequent use. This is of great significance to ensure the normal operation and long-term stability of the plastic piping system.