The installation of large-diameter PE pipes in high temperature environments faces many challenges. Among them, the prevention and control of thermal deformation of the material is crucial. High temperature will change the material properties of PE pipes. If it is not prevented and controlled, it is easy to lead to problems such as pipeline deformation and poor connection. The choice of construction window period cannot be ignored. High temperature periods may soften the pipeline, which is not conducive to accurate installation and fixing. High temperature periods such as noon should be avoided, and construction should be carried out in the morning and evening when the temperature is relatively suitable. Before installation, the pipe should be pre-adapted and placed in the installation environment for a period of time to reduce the difference in thermal deformation. During the installation process, the welding temperature and time should be strictly controlled to ensure the quality of the connection. At the same time, support and fixing should be done to prevent displacement due to thermal deformation. Only by comprehensively doing a good job in the prevention and control of material thermal deformation and grasping the construction window period can we ensure the installation quality and use effect of large-diameter PE pipes in high-temperature environments.
