In the fields of industrial and municipal water supply and drainage, large-diameter PE pipes are widely used due to their advantages such as corrosion resistance and good flexibility. However, when the large-diameter PE pipes have insufficient conveying pressure, it will affect the normal operation of the entire system. At this time, it is necessary to investigate the system resistance and equipment failures.

First look at the system resistance. The pipeline layout is unreasonable, such as too many elbows and too long distance, which will increase the fluid flow resistance. There is also scaling on the inner wall of the pipeline, which will reduce the flow area and increase the resistance. It can be improved by optimizing the pipeline layout and regularly cleaning the inner wall of the pipeline.

Check the equipment failure again. As a key equipment to provide power, if the impeller of the pump is worn and the seal is damaged, it will lead to insufficient flow and pressure. Check the degree of wear of the impeller of the pump and replace the seal in time. In addition, valve failure, such as the valve is not fully opened or internal leakage, will also cause the pressure to drop. Make sure the valve is in the correct open state and check the sealing performance of the valve.

Overall, when the conveying pressure of large-diameter PE pipes is insufficient, detailed investigation of system resistance and equipment failures, and targeted measures can effectively solve the problem and allow the pipeline system to resume normal operation.