In the field of plastic pipes, large-diameter PE pipes are more and more widely used. However, the installation quality directly affects the use effect and life. The installation quality control point of large-diameter PE pipes lies in the whole process inspection and risk anticipation.
Before installation, pipe inspection is the foundation. Check the appearance for cracks and deformation, and measure whether the pipe diameter and wall thickness meet the standards. During transportation and storage, avoid collision and sun exposure.
During installation, the excavation depth and width of the pipe trench should be accurate. When connecting the pipeline, it is very important to control the temperature, pressure and time of the hot melt butt. After the welding is completed, conduct an appearance inspection to see if there is any false welding or missed welding.
After installation, the pressure test is indispensable. Test according to the specified pressure and time to observe whether there is leakage. At the same time, do a good job of marking and protection to prevent subsequent construction damage.
In terms of risk anticipation, consider the influence of geological conditions on the pipeline in advance, such as settlement and displacement. The temperature change of the construction environment may affect the connection quality. Through the whole process inspection and risk anticipation, ensure the installation quality of large-diameter PE pipe and give play to its advantages.
