In municipal engineering or various types of underground pipe network construction, PE carat pipes are widely used due to their excellent performance. However, sometimes settlement occurs after laying, which in turn causes the problem of pipeline deformation. When encountering this situation, it is first necessary to comprehensively survey the site. Check the surrounding geological conditions to see if settlement is caused by soft soil and unreliable backfill. If backfill problems occur, the backfill needs to be re-tamped to ensure that the compactness is up to standard. For pipes with slight deformation, local support reinforcement can be used, and suitable support materials (such as steel, etc.) can be used to support the deformation to restore the shape of the pipeline. If the deformation is serious, part of the pipeline may need to be replaced. During construction, attention should be paid to interface treatment to ensure tight connection. At the same time, follow-up monitoring needs to be strengthened to avoid similar problems from happening again. In conclusion, for the settlement and deformation of PE carat pipes after laying, scientific analysis and accurate measures are required to ensure the normal operation and engineering safety of the pipeline system.
