In the field of pipeline engineering, the application of large-diameter PE pipes is becoming more and more extensive. As an important connection method, electrofusion connection is essential for beginners to master standardized processes and technical points.
The first is the preparation before connection. Make sure that the pipes and fittings are clean to remove oil, impurities, etc. Check whether the fused pipe fittings are in good condition and damaged. Measure the insertion depth of the pipe and mark it.
During the connection process, insert the pipe into the fused pipe fitting to the marked place and keep it centered. Then connect the fused welder according to the equipment requirements and enter the correct welding parameters, such as voltage and time. During the welding process, pay attention to observe the changes of the fused pipe fittings to ensure uniform welding.
After the welding is completed, enter the cooling stage. At this stage, it is strictly forbidden to move the pipes and fittings, and let them cool naturally to room temperature. The cooling down needs to be carried out in strict accordance with the standards to ensure the welding strength.
When a novice operates, there are easy problems such as pipe insertion is not in place, which will lead to weak welding. There are also wrong welding parameter settings, which affect the welding quality. So the novice must carefully read the product manual and conduct more simulation exercises. At the same time, pay attention to the welding environment and avoid working under harsh conditions such as humidity and strong wind. By following these standardized processes and technical points, the novice can gradually master the electrofusion connection technology of large diameter PE pipes, laying the foundation for the smooth implementation of pipeline engineering.