Core requirements for pipeline selection of Hubei municipal rain and sewage project
Hubei has a large geographical span, a lot of soft soil foundations in the Jianghan Plain, and a large undulating terrain in the mountainous area of western Hubei. Coupled with the characteristics of concentrated rainfall in the Meiyu season and overload of the old urban pipe network, the municipal rain and sewage projects have far higher requirements for anti-settlement, corrosion resistance and water permeability of pipelines than ordinary civilian scenarios. With its characteristics of light weight, smooth inner wall and long service life, plastic pipelines have become the mainstream selection for rain and sewage diversion transformation and new pipe network projects in various parts of Hubei, which can be adapted to the geological and drainage needs of different regions.
Directly from the manufacturer model of the engineering side value advantage
The price increase of multi-layer intermediaries in the traditional procurement model often pushes up the procurement cost, and may even cause problems such as wrong goods and lagging distribution due to the long supply chain. The directly from the manufacturer model directly connects with the municipal engineering purchaser, eliminating the premium space in the intermediate circulation link, and can schedule production on demand according to the actual amount of the project, which can not only reduce the procurement cost, but also avoid the waste of hoarding. The supply cycle fully matches the project schedule and ensure the stability of pipeline quality from the source.
Direct supply supporting services adapt to local construction scenarios
According to the different construction conditions of Hubei municipal engineering, the manufacturer can provide targeted technical support: before entering the site, the joint construction party does pipeline selection and adaptation, the distribution link is delivered to the site in batches according to the construction node, and the on-site installation stage arranges technicians to guide the key processes such as interface sealing and groove backfilling to avoid leakage and pipeline deformation caused by improper operation.
At present, Hubei province is promoting the county rain sewage pipe network full coverage, urban old pipe network transformation and other municipal projects, directly from the manufacturer of plastic rain sewage pipe, with cost, quality, service multi-dimensional advantages, is becoming more municipal projects procurement choice.