The integrated construction of Wuhe, Hubei and Huanghuang is the core measure to promote the coordinated development of eastern Hubei. As the infrastructure skeleton, the construction quality of the supporting power pipes and drainage pipes directly affects the efficiency of regional development.

In the early stage of construction, it is necessary to do a good job of collaborative planning. According to the direction, width and underground space layout of the road network, the laying path of the power pipe and the drain pipe should be designed synchronously to avoid repeated excavation in the later stage and reduce the construction cost and impact on traffic. Plastic power pipes need to consider the pipe diameter suitable for the cable, and the drain pipe should optimize the pipe diameter and slope according to the regional rainfall to ensure smooth drainage.

In terms of material selection, plastic pipes have become the best choice for supporting construction due to their advantages such as corrosion resistance, light weight and convenient construction. Power pipes need to have good insulation properties and compressive strength to resist the complex stress of the underground environment; drain pipes should take into account anti-aging and anti-initializing ability to adapt to long-term rainwater and sewage discharge needs.

The installation stage needs to strictly follow the specifications: the buried depth of the power pipe needs to meet the power laying standards, the pipeline interface is sealed to prevent moisture from infiltrating and affecting the safety of the cable; the drain pipe should ensure a uniform slope, and the interface should be treated with anti-leakage treatment to avoid water accumulation in the pipeline network. During the construction process, on-site inspections need to be carried out synchronously to adjust the deviation in time to ensure the accurate layout of the pipeline.

The quality control in the final stage cannot be ignored. Through hydraulic testing, insulation testing and other means, the sealing and performance stability of the pipeline are verified, and a solid foundation is laid for the long-term safe operation of the road network. Scientific plastic pipeline supporting construction will provide a solid municipal guarantee for the integrated construction of Wuhan, Hubei, and Huanghuang, and help regional interconnection and sustainable development.